loader
  • : (+94) 76 601 9215

Solar Power System in Moratuwa

about project


The main objective of the project was to replace the solar panel system in order to reduce the newly added monthly energy bill of the office and contribute to mitigation effort of Green Houses Gases (GHG) emissions.

customer's wishes

The existing lighting systems are manually operated by the occupants. Therefore lighting may be on continuously until the custodians are leaving the building after clean up hours. Individual offices and private spaces have isolated single or double wall switches. The present system without planned sequence of lighting utility sustains a significant energy waste. This should be streamlined with proper control technologies.

finishing process

The project encompass of two distinct phases i) the energy audit of the building and delivery improvement, to ensure energy saving through integration of on or off-grid solar photovoltaic (PV) system; ii) energy cost reduction through lighting management systems. The installation, testing and management plan was carried out in two weeks.

project details


Complete Project :

june 16, 2019

client :

Mr. Malinda Wijewickrama

location :

50, Sendric Place, Moratuwa

surface area :

142.6 m2

value :

LKR 5,500,000

supervisor :

Mr. M A Lahiru

project category :

Solar Upgrade